The Abreast of the times Guide To 70-499 prep Oct 2017


♥♥ 2017 NEW RECOMMEND ♥♥

Free VCE & PDF File for Microsoft 70-499 Real Exam (Full Version!)

★ Pass on Your First TRY ★ 100% Money Back Guarantee ★ Realistic Practice Exam Questions

Free Instant Download NEW 70-499 Exam Dumps (PDF & VCE):
Available on: https://www.certleader.com/70-499-dumps.html


70-499 Product Description:
Exam Number/Code: 70-499 vce
Exam name: Recertification for MCSD: Application Lifecycle Management
n questions with full explanations
Certification: Microsoft Certification
Last updated on Global synchronizing

Instant Access to Free VCE Files: Microsoft 70-499 Recertification for MCSD: Application Lifecycle Management

70-499 examcollection

Your success in Microsoft 70-499 is our sole target and we develop all our 70-499 braindumps in a way that facilitates the attainment of this target. Not only is our 70-499 study material the best you can find, it is also the most detailed and the most updated. 70-499 Practice Exams for Microsoft 70-499 are written to the highest standards of technical accuracy.

Q1. - (Topic 2) 

You are using Microsoft Test Manager (MTM). 

You need to develop test cases that trace to a set of requirements. 

What should you do? 

A. Add the requirements as test step attachments. 

B. Add links from the test cases to the requirements. 

C. Add links from the test suite to the requirements. 

D. Add the requirements as test case attachments. 

Answer:


Q2. - (Topic 1) 

Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server. 

You need to rebuild both the Team Foundation Data Warehouse and the SQL Server Analysis Services Cube from scratch. 

What are two possible ways to achieve this goal? (Each correct answer presents a complete solution. Choose two.) 

A. Use Microsoft SQL Server Management Studio. 

B. Use SQL Server Business Intelligence Development Studio. 

C. Use Warehouse Control Web Service. 

D. Use the Reporting section in Team Foundation Administration Console. 

E. Restart SQL Server Analysis Services service, SQL Server service, and SQL Server Agent service by navigating to the Services option under Administrative Tools. 

Answer: C,D 


Q3. - (Topic 1) 

You are the administrator of a Microsoft Visual Studio Team Foundation Server (TFS) system that uses version control proxies at remote sites to reduce the burden on the WAN. 

The hard disk that stores the cache for a version control proxy server is upgraded to a 

larger size. 

Management wants to ensure that more of the disk is used but not all of it. 

You need to ensure that the proxy always uses a maximum of 15 GB for caching. 

What should you do? 

A. Modify the caching policy to use a PercentageBasedPolicy. 

B. Change the DataDirectory to include an additional path. 

C. Change the caching policy to use a FixedSizeBasedPolicy. 

D. Update the CacheDeletionPercent parameters. 

Answer:

Explanation: http://msdn.microsoft.com/en-us/library/ms400763(v=vs.100).aspx 


Q4. - (Topic 1) 

Your network environment includes Microsoft Visual Studio Team Foundation Server (TFS) 2012. You are using Microsoft Lab Management (MLM) 2012. Automatic host group provisioning is turned off. 

You need to allocate a Microsoft System Center Virtual Machine Manager (SCVMM) 2012 host group to the team project. 

Which two tools should you use? Each correct answer presents part of the solution. (Choose two.) 

A. TFSConfig.exe with the lab command name 

B. Visual Studio 2012 Team Explorer 

C. Microsoft Test Manager (MTM) 

D. TFS Administration Console 

Answer: A,D 


Q5. - (Topic 2) 

You are using Microsoft Test Manager (MTM) to review the work items assigned to two of your team members. 

You need to run a query from the Queries activity and compare the results to a second query without going to a second workstation. 

What should you do? 

A. Click the New query option to open a second Queries activity. 

B. Click the Queries view to open a second Queries view, and compare the results of the two queries. 

C. Click New and create a new task from the drop-down menu. 

D. Launch another instance of MTM and execute a second query. 

Answer:


Q6. DRAG DROP - (Topic 1) 

Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server. 

You need to configure TFS to send an email notification to a group of testers when a build is completed. 

What should you do? (To answer, move the three appropriate actions from the list of actions to the answer area and arrange them in the correct order.) 

Answer: 

30. - (Topic 1) 

You have a newly installed Microsoft Visual Studio Team Foundation Server (TFS). Both TFS and SQL server are installed on the same server. The SQL server installation includes the database engine component only. 

You need to utilize all available TFS Reporting features. 

Which two actions should you perform? Each correct answer presents part of the solution. 

A. Install SQL Analysis Services. 

B. Enable Data Quality Services. 

C. Install SQL Server Reporting Services. 

D. Install SQL Server Client Tools Connectivity. 

Answer: A,C 

Explanation: http://msdn.microsoft.com/en-us/library/dd578652.aspx 


Q7. - (Topic 2) 

You are using Microsoft Test Manager (MTM). You have created some shared steps for a recurring test sequence. 

You plan to use these shared steps with fast-forward playback in multiple test cases. 

You need to create an action recording for the shared steps. 

What are two possible ways to accomplish this goal? (Each correct answer presents a complete solution. Choose two.) 

A. Include the shared steps work item in the test case. Start running the test case with action recordings enabled. When the shared steps are reached, select Start and record. 

B. Include the shared steps work item in the test case. Right-click the shared steps and click Create action recording. 

C. Open the shared steps work item in Shared Steps Manager and select the tab for Create action recording. 

D. From the Shared Steps Manager, select the shared steps work item and click Create action recording. 

Answer: A,D 


Q8. - (Topic 3) 

You manage a development team that has been assigned the task of developing a reporting application. The team holds a kickoff meeting with the stakeholders to document user requirements. 

You review the draft requirements list that results from this meeting. 

You need to indicate which requirements likely will require rework before you can send the requirements list to the development team. 

Which three actions should you perform? (Each correct answer presents part of the solution. Choose three.) 

A. Identify requirements that are independent of other requirements. These requirements likely will need to be integrated with the other requirements. 

B. Identify requirements that cannot be tested easily. These requirements likely will need details to make them more testable. 

C. Identify requirements that do not have estimates. These requirements likely will need additional details before they can be approved. 

D. Identify requirements that depend on other requirements. These requirements likely will need to be split. 

E. Identify requirements that provide little business value. These requirements likely will need to be reconsidered. 

Answer: C,D,E 


Q9. - (Topic 3) 

You are using the Microsoft Visual Studio Scrum 2.0 process template. You recently finished a sprint. 

You need to conduct a retrospective meeting prior to planning the next sprint. 

What should you do? 

A. Analyze and revise the story points of the work items completed in the previous sprint. 

B. Analyze the previous sprint to identify what the team is going to do differently during the next sprint. 

C. Analyze items in the product backlog for the next sprint. 

D. Determine which items have been finished on the previous sprint. 

Answer:

273. - (Topic 3) 

You manage a development team that uses the Microsoft Visual Studio Scrum 2.0 process template. 

You establish a product backlog, allocate backlog items for a sprint, and define the tasks required to complete the sprint. 

You need to ensure that the agreed upon work is assigned to team members. 

Who should be responsible for assigning work to team members? 

A. Team members 

B. Product owner 

C. Scrum master 

D. Team lead 

Answer:

Explanation: In Scrum, work should never be directed or assigned. When creating or updating a task, don’t assign it to anyone who doesn’t request the work. 

Professional Scrum Development with Microsoft Visual Studio 2012 p.183 


Q10. - (Topic 3) 

You are developing an n-tier application. An architect has provided a layer diagram as shown in the exhibit image. (Click the Exhibit button.) 

Your code is built as part of an automated team build. 

A class in the data access layer is changed to utilize a utility class that resides in the business logic layer. 

You need to ensure that the code and layer diagram are valid in a manner that follows good architectural and object oriented practices. 

What should you do? 

A. Create a new cross-cutting layer and refactor the utility class into the new layer, allowing the new layer to reference both the data access layer and the business logic layer. 

B. Leave the layers the same and duplicate the utility class in both the data access layer and the business logic layer. 

C. Create a new cross-cutting layer and refactor the utility class into the new layer, allowing the data access layer and business logic layer to have one-way dependencies to the new layer. 

D. Change the dependency between the data access layer and the business logic layer to be bi-directional. 

Answer:

256. - (Topic 3) 

You manage a geographically dispersed development team that uses the Microsoft Visual Studio Scrum 2.0 process template. 

Each of the four locations has approximately six team members. 

You need to optimize the team’s performance to minimize the impact of the geographic dispersion. 

What should you do? 

A. Setup a persistent video conference feed between the locations. 

B. Use a phone conference line for daily standups. Use a paper-based planning board and take snapshots of the board after daily standups. 

C. Organize the teams into a scrum of scrums, in which each location has a standalone team. Work off of a single product backlog and meet regularly with the leads of each scrum team. 

D. Use electronic planning and a shared source control repository so that all team members are using a single set of sources. 

Answer:



To know more about the Recertification for MCSD: Application Lifecycle Management, click here.