70-499 Product Description:
Exam Number/Code: 70-499 vce
Exam name: Recertification for MCSD: Application Lifecycle Management
n questions with full explanations
Certification: Microsoft Certification
Last updated on Global synchronizing

Instant Access to Free VCE Files: Microsoft 70-499 Recertification for MCSD: Application Lifecycle Management

70-499 examcollection

Cause all that matters here is passing the Microsoft 70-499 exam. Cause all that you need is a high score of 70-499 Recertification for MCSD: Application Lifecycle Management exam. The only one thing you need to do is downloading Exambible 70-499 exam study guides now. We will not let you down with our money-back guarantee.

Q141. - (Topic 3) 

You manage a project for which the team has not delivered all of the story points committed to in a previous sprint. 

You want to define the amount of work the team can commit to for the next sprint of the project. 

What should you do? 

A. Review the sprint burndown to define the amount of work. 

B. Review the team velocity to define the amount of work 

C. Allow the product owner to define the amount of work. 

D. Review capacity of the team to define the amount of work. 

Answer:


Q142. - (Topic 1) 

Your company uses Microsoft Visual Studio Team Foundation Server (TFS). You have permissions to modify work items. 

The current product backlog item WIT is functioning properly. However, the product owner needs to track each product backlog item's estimated value to the company. The company has a system that ranks value by using a grading system of A-E. The company needs a new field in the product backlog item that captures this system and only allows A-E. 

You need to modify the product backlog item WIT on the server. 

Which two actions should you perform? Each correct answer presents a complete solution. 

A. Use the TFS administration console to add a field product backlog item WIT. 

B. Use the process template manager, and download the process template. Use the process template editor to edit the WIT. Upload the edited template as a new process template. 

C. Use the process template editor to add a field to the existing WIT. 

D. Use witadmin.exe to download the XML Edit the XML to add the field, and use witadmin to upload the edited XML document. 

Answer: A,B 

Explanation: http://msdn.microsoft.com/en-us/library/vstudio/ms194980(v=vs.110).aspx 


Q143. - (Topic 2) 

You are using Microsoft Test Manager (MTM). 

Your company no longer supports a particular configuration for the application under test. 

You need to ensure that the test configuration is unavailable as an option in a test plan. 

Which state should you assign to the test configuration? 

A. Closed 

B. Inactive 

C. Disabled 

D. Idle 

Answer:


Q144. DRAG DROP - (Topic 2) 

You are a software quality manager. Your company is using Microsoft Visual Studio to develop an application. 

Your development team is almost finished with its first iteration. The testing team is preparing to verify that the product requirements are met. 

You need to test the requirements. 

Which three actions should you perform in sequence? To answer, move the correct actions from the list of actions to the answer area and arrange them in the correct order. 

Answer: 


Q145. - (Topic 1) 

Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server. Your developers use Visual Studio 2012. 

Developers frequently work from locations where there is no network connection. 

You need to ensure that developers are able to easily compare their current changes to the last version retrieved from version control. 

Which type of workspace should you configure? 

A. Server 

B. Local 

C. Server-synchronized 

D. Windows Azure 

Answer:


Q146. - (Topic 3) 

Your company’s help desk support team comprises a single individual using an Excel spreadsheet to track tickets. 

You want to improve the flow of information between the help desk and your development team. 

You need to ensure that the lead developer receives updates only when new software defects are reported by the help desk. 

What are two possible ways to achieve this goal? (Each correct answer presents a complete solution. Choose two.) 

A. 

Create a custom list on SharePoint to capture ticket information. 

Have the lead developer subscribe to an alert for each ticket that is created with a type of 

 “software defect”. 

B. 

Use the System Center 2012 Ticket Manager to capture tickets from the help desk. 

Enable the ticket integration adapter to push tickets captured in System Center to TFS as bug work items. 

Have the lead developer subscribe to alerts for his or her assigned work items. 

C. 

Create a team project on your Team Foundation Server with a custom process template to track tickets. 

For software defects, have the help desk assign the tickets to the lead developer. 

Have the lead developer review his or her assigned tickets. 

D. 

Publish the Excel spreadsheet to a SharePoint document library. 

Configure an alert to notify the development lead when the spreadsheet is modified. 

Answer: A,C 


Q147. - (Topic 3) 

You are using the Microsoft Solution Framework (MSF) for Capability Maturity Model Integration (CMMI) Process Improvement 6.0 process template. 

A stakeholder has requested a change, but the change request has not received the attention that it requires. 

You need to escalate the change request. 

What should you do? 

A. 

Create an impediment work item. 

Link the new impediment to the change request. 

Escalate the impediment to get the change request on track. 

B. 

Create a bug work item. 

Link the new bug to the change request. 

Escalate the bug to get the change request on track. 

C. 

Create an issue work item. 

Link the new issue to the change request. 

Escalate the issue to get the change request on track. 

D. 

Create another change request work item. 

Link the new change request to the change request. 

Escalate the change request to get the change request on track. 

Answer:

Explanation: If a change request does not receive the attention that it requires, escalate the matter by creating an issue work item. Link the new issue to the change request, and escalate the issue to get the change request impact assessment on track. 

http://msdn.microsoft.com/en-us/library/ee461569.aspx 


Q148. - (Topic 1) 

Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server. All requests pass through an HTTP proxy before reaching users. 

You need to allow access to the server over HTTPS for remote workers. 

Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.) 

A. Configure Basic authentication. 

B. Configure SSL. 

C. Configure Kerberos authentication. 

D. Add the users to the user identities in Internet Information Services (IIS). 

E. Configure a TFS proxy server. 

Answer: A,B 


Q149. HOTSPOT - (Topic 2) 

You are a development operations engineer. You are a member of the development team and are working on Project A. You are in the middle of a Sprint 5. 

The developers assign work items that instruct you to make changes to config files for web services. The development team needs to add a new functionality to the web services during the sprint. 

You need to query the work items assigned to you that are related to the new functionality. 

Which filters should you configure in order to build a flat list of work items? To answer, configure the appropriate options in the dialog box in the answer area. 

Answer: 


Q150. - (Topic 1) 

Your network environment includes a Microsoft Visual Studio Team Foundation Server 2012 (TFS) server. 

You build a multi-tiered application that contains the following tiers: 

.... 

User Interface Application Services Integration Services Database 

You need to modify the item template to meet the following requirements: 

.. 

When a bug is created, the testing team is able to identify the application tier. You are able to produce a report of bugs by tier. 

Which three actions should you perform? (Each correct answer presents part of the solution. Choose three.) 

A. Add a control to the work item FORM. For type, select WorkltemClassificationControl. 

B. Add a new FIELD called Custom.ApplicationTier Application Tier and configure its list of ALLOWEDVALUES LISTITEMS to be: 

User Interface 

Application Services 

Integration Services 

Database 

C. 

Add a control to the work item FORM. For type, select FieldControl. 

D. 

Add the attribute reportable^Dimension to the FIELD definition. 

E. 

Add the attribute reportable = Measure to FIELD definition. 

Answer: A,B,C 