[Accurate] 70-499 Microsoft practice question 111-120 (Mar 2018)


♥♥ 2017 NEW RECOMMEND ♥♥

Free VCE & PDF File for Microsoft 70-499 Real Exam (Full Version!)

★ Pass on Your First TRY ★ 100% Money Back Guarantee ★ Realistic Practice Exam Questions

Free Instant Download NEW 70-499 Exam Dumps (PDF & VCE):
Available on: https://www.certleader.com/70-499-dumps.html


70-499 Product Description:
Exam Number/Code: 70-499 vce
Exam name: Recertification for MCSD: Application Lifecycle Management
n questions with full explanations
Certification: Microsoft Certification
Last updated on Global synchronizing

Instant Access to Free VCE Files: Microsoft 70-499 Recertification for MCSD: Application Lifecycle Management

70-499 examcollection

Want to know Pass4sure 70-499 Exam practice test features? Want to lear more about Microsoft Recertification for MCSD: Application Lifecycle Management certification experience? Study Best Quality Microsoft 70-499 answers to Avant-garde 70-499 questions at Pass4sure. Gat a success with an absolute guarantee to pass Microsoft 70-499 (Recertification for MCSD: Application Lifecycle Management) test on your first attempt.

Q111. - (Topic 1) 

Your network environment includes a Microsoft Visual Studio Team Foundation Server 2012 (TFS) server. A single build machine is installed with one controller and two agents. The working directories are configured to use the following working directory: 

$(SystemDrive)\\Builds\\$(BuildAgentId)\\$(BuildDefinitionPath). 

Your system drive is running out of space and some builds often fail with the following error: 

“The specified path, file name, or both are too long. The fully qualified file name must be less than 260 characters, and the directory name must be less than 248 characters.” 

You need to meet the following requirements: 

. Point the working path to drive D. . Construct a working directory that can be used to define the shortest unique path for each build agent it is used on. 

What should you do? 

A. Set the Build Agent working directory path to D: \\BId\\$(BuildAqentld)\\$(BuildDetinitionPath). 

B. Create a system variable named BuildDrive and set its value to D: \\. 

C. Set the Build Service working directory path to D: \\BId\\$(BuildAqentld)\\$(BuildDefinitionPath). 

D. Set the Team Foundation Build variable named $(BuildDrive) to the value D: \\. 

Answer:


Q112. - (Topic 3) 

You are developing an application that has several automated builds that build, perform code analysis, and unit test portions of your code. Your team also performs peer review for code changes in an informal manner. 

You need to meet the following requirements: 

. Provide documentation on quality checks and reviews for any changes to the code 

base. 

. Ensure code quality. 

. Maintain your team’s efficiency. 

What should you do? 

A. Institute gated check-ins to the build process. 

B. Deny developers check-in permissions. Allow them to shelve changes and have a senior team member check in the shelve-set after review. 

C. Utilize the Code Review work items and workflow before check-ins. 

D. Perform a weekly code review on subset of recent check-ins. 

Answer:


Q113. - (Topic 2) 

You are using Microsoft Test Manager (MTM). You are using the Microsoft Solution Framework (MSF) for Agile Software Development process template. SharePoint integration and reporting are enabled. 

You want to assess the progress of your team’s testing effort. 

To do this, you need to: 

Identify gaps in test coverage. 

Monitor test progress for each requirement, and. 

Identify how many test cases are passing or failing for each requirement. 

What should you do? 

A. Open the test plan in MTM and look at the test plan status. 

B. From Team Explorer, open the Stories Progress report. 

C. From the team portal, open the Test Plan Progress Excel Report. 

D. From the team portal, open the User Story Test Status Excel Report. 

Answer:

... 


Q114. - (Topic 2) 

You are using Microsoft Test Manager (MTM). 

Your company has configured multiple test configurations. 

You need to set all active test configurations as the default for all new test plans. 

What should you do? 

A. Select the Active state option for each test configuration. 

B. Select the Default option for each test configuration. 

C. Select multiple test configurations from the test plan. 

D. Select the Assign to new test plans option for each test configuration. 

Answer:


Q115. - (Topic 2) 

You plan to conduct a test for a multi-tier ASP.NET website using Microsoft Test Manager (MTM). You have created a test plan named QA Release 1.0. You also have created a test setting for the QA Release 1.0 test plan with the Database, Web Client, and Web Server roles. 

The QA Release 1.0 test plan must specify that test runs: 

. Collect specific diagnostic trace information to help analyze bugs that are difficult to reproduce, and . Collect information about which methods of your applications code were used when a test case was run. 

You need to configure the QA Release 1.0 test plan to meet these requirements. 

What should you do? 

A. Enable and configure the IntelliTrace, ASP.NET Client Proxy for IntelliTrace and Test Impact, and Test impact diagnostic data adapter settings. 

B. Enable and configure the IntelliTrace, ASP.NET profiler, and Event log diagnostic data adapter settings. 

C. Enable and configure the IntelliTrace, ASP.NET Client Proxy for IntelliTrace and Test Impact, and ASP.NET profiler diagnostic data adapter settings. 

D. Enable and configure the ASP.NET profiler, Code coverage, and IntelliTrace diagnostic data adapter settings. 

Answer:


Q116. - (Topic 3) 

Your development team is using the Microsoft Solution Framework (MSF) for Capability 

Maturity Model Integration (CM MI) Process Improvement 6.0 process template. 

You identify the high business value requirements of a project. 

You need to prioritize the requirements and ensure that the updates are reflected on the 

TFS reports. 

Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.) 

A. Set the Priority to 1 for each of the high-value requirements. 

B. Use Microsoft Project. 

C. Set the Stack Rank attribute to Top for each of the high-value requirements. 

D. Use the Product Backlog feature. 

Answer: A,D 


Q117. - (Topic 2) 

You are using Microsoft Test Manager (MTM). You are using the Microsoft Solution Framework (MSF) for Agile Software Development process template. 

You have created a test plan named Validate_User_Registration that contains test cases for validating new user registrations. 

All the user stories for the new user registration feature have been stored as work items in Team Foundation Server 2012. 

You need to associate the user registration user stories with the test cases in the Validate_User_Registration test plan. 

What should you do? 

A. Open the test plan. Use the Add requirements function to add the user registration requirements. 

B. Open the test cases. Upload the user registration requirements document as an attachment. 

C. Open the test cases. From the Tested User Stories tab, link the test case to the associated user stories. 

D. Open the test plan. Link the user registration requirements document to the test plan. 

Answer:


Q118. DRAG DROP - (Topic 2) 

You are a test developer using Microsoft Test Manager (MTM). 

You are editing a test plan for a product. 

You need to supply a new custom configuration variable in the configuration setting for one 

of the test cases. 

In which order should you perform the actions in MTM? To answer, move all actions from 

the list of actions to the answer area and arrange them in the correct order. 

Answer: 


Q119. - (Topic 3) 

You are developing a new application. The application will require rapid changes after it is in production. 

You need to implement practices that promote high quality and ensure the code is maintainable. 

Which three practices should you implement? (Each correct answer presents part of the solution. Choose three.) 

A. Refactor code based on code metrics from the maintainability index. 

B. Keep the code tightly coupled. 

C. Create as few classes as possible. 

D. Create unit tests and monitor code coverage. 

E. Create as few assemblies as possible. 

F. Refactor code based on code clone analysis. 

Answer: A,D,F 


Q120. DRAG DROP - (Topic 2) 

You are using Microsoft Test Manager (MTM) to manage your testing efforts. 

You want to see which work items have changed since the last time you assigned a build to the test plan. 

You need to assign a new build to the test plan and create a list of the bugs that have been fixed and the features that have been associated with the new build. 

What should you do? (To answer, move the three appropriate actions from the list of actions to the answer area and arrange them in the correct order.) 

Answer: 



To know more about the Recertification for MCSD: Application Lifecycle Management, click here.